Fraser Rise Building
Inspections

Cables touching gas pipes inside a lock-up frame

The 25 mm gap between wiring and gas pipes, and why lock-up is the only time to check it.

Fraser Rise 3336 · 2026-04-02

In short: Two trades work in the same wall a few days apart. Unless someone looks before plaster, nobody checks where the cable ended up against the pipe.

The rule

Above ground consumer gas pipes need at least 25 mm of separation from electrical cables and conduits. Water pipes, hot and cold, have clearance rules of their own.

What we recorded

On a Fraser Rise lock-up, cables were run straight across and against copper gas pipes in more than one wall, with no separation at all.

Why it matters

Rubbing and heat over the years can damage cable insulation. Next to gas, that is a risk worth a few cable ties to avoid.

Other lock-up items in the same walls

Top plates notched deeper than allowed to pass services, and sewer pipes left uncapped for debris to fall in.

Timing

Lock-up, after rough in and before plasterboard. A week later the walls are lined and the answer is unknown.

Written by our local inspection team from work carried out in Fraser Rise. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More new construction stage inspections guides for Fraser Rise

All guides →

Book a building inspection in Fraser Rise

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Fraser Rise owners ask about this

Is this an electrical inspection?

No. We report the visible clearance between services. Compliance of the wiring itself is for a licensed electrician.

How is it fixed?

The cable is moved and clipped clear of the pipe. It takes minutes.

Does the surveyor check this?

The mandatory inspections are for the permit and do not produce a services clearance list for you.

What about water pipes?

We record cables touching hot and cold water pipes as well, where the gap is short.

CallGet a Free Quote