Slab pre-pour inspection in Fraser Rise

Pods, polythene and steel checked on the last day they are visible.

  • Formwork, pods, barrier and steel finished, a day ahead of the concrete truck
  • About 1 hour on site
  • Report within 24 hours
Request a quoteA few details and one of our inspectors rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage2 of 7
When to bookFormwork, pods, barrier and steel finished, a day ahead of the concrete truck
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, NCC Part 3.2, the engineer's slab design and the soil report

What is included in a Fraser Rise slab pre-pour inspection

  • Slab class and layout checked against the engineer's design and the soil report
  • Edge beam and internal beam depths and widths
  • Reinforcement size, spacing, laps and trench mesh
  • Bar chairs, cover and support so steel does not sit on the ground
  • Waffle pods, void formers and pod spacing
  • Vapour barrier coverage, laps and tape at penetrations
  • Plumbing and electrical penetrations and sleeves
  • Set-downs for wet areas, garage, porch and alfresco
  • Termite management components installed before the pour
  • Formwork alignment, level and set-out against the plans
  • Stormwater pipe cover and pit positions where visible
  • Site cut, fill and pier holes where visible
  • Hot water service and meter box slab extensions formed
  • Trench cleanliness and debris before the pour
Why it matters here

Slab pre-pour inspections on Fraser Rise builds

Fraser Rise slabs are mostly waffle pod rafts with deepened edge beams, and the pre-pour list here keeps coming back to the same few things. Polythene that stops short of the beam so part of the slab sits straight on the ground. Punctures left open instead of patched and taped. Mesh sagging between chairs so cover will differ from one bay to the next. Loose excavated soil left beside the pods. We also check that shower recesses are formed, because a set down missed now means a step or a grinder later.

What we find at this stage in Fraser Rise

  • Vapour barrier stopping short of an edge or internal beam
  • Punctured polythene not patched and taped
  • Mesh sagging between bar chairs
  • Top trench mesh missing from a strip footing
  • Shower recess set down not formed
Shower recess not formed, recorded on a slab pre-pour inspection in Fraser Rise
Shower recess set down not yet formed in the slab
Sample findings

Sample defects found during our slab pre-pour inspections in Fraser Rise

Annotated findings from Slab pre-pour inspections.

Vapour barrier not extended beneath the entire slab, recorded on a slab pre-pour inspection in Fraser Rise
Polythene ending before it reaches the bottom of the edge beam
Barrier punctures not sealed, recorded on a slab pre-pour inspection in Fraser Rise
Holes in the vapour barrier left without a polythene patch and tape
Slab mesh sagging, recorded on a slab pre-pour inspection in Fraser Rise
Slab mesh dipping between supports, so concrete cover will be uneven
Strip footing top trench mesh missed, recorded on a slab pre-pour inspection in Fraser Rise
Strip footing missing its top layer of trench mesh before the pour

The other stages of a Fraser Rise build

  1. Bored piers inspection in Fraser Rise1Bored piersHoles drilled and steel cages in, with the concrete pump not yet booked
  2. Frame inspection in Fraser Rise3FrameWalls standing, trusses fixed and roof covering on, before insulation goes in
  3. Lock-up (pre-plaster) inspection in Fraser Rise4Lock-up (pre-plaster)Windows, external doors and cladding done, services roughed in, plaster not started
  4. Fixing inspection in Fraser Rise5FixingDoors, architraves, skirtings and cabinets in, painter yet to start
  5. Waterproofing inspection in Fraser Rise6WaterproofingMembrane on and cured in every wet area, tiler not yet on site
  6. Pre-handover (PCI) inspection in Fraser Rise7Pre-handover (PCI)House finished and cleaned, two to three weeks out from settlement

All construction stage inspections in Fraser Rise →

Guides

Construction stage guides for Fraser Rise

All guides →

Book a slab pre-pour inspection in Fraser Rise

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Slab pre-pour inspections in Fraser Rise: common questions

Why does a short barrier matter?

The polythene keeps ground moisture out of the concrete. Where it stops short of a beam, that section of slab sits on soil and can draw damp into floor coverings years later.

What should happen to a puncture?

It gets a patch of polythene and tape over it. Left open, it is a hole in a layer that only works when it is continuous.

Why do you check shower recesses at slab stage?

A recessed shower needs the slab set down where the shower goes. If the set down is missed, the fix later is a step into the shower or grinding concrete.

How long is the inspection?

About an hour, longer on a large double storey footprint. The report usually goes out the same evening so the builder can act before the truck.

My pour date keeps moving. Is that a problem?

No. Let us know and we move with it. Changing the date of a stage inspection costs nothing.

Can the slab be checked after it is poured?

Only its surface and edges. Steel, barrier and pods are gone from view, which is why this visit happens the day before.