Waterproofing inspection in Fraser Rise

Every shower, bath and laundry membrane checked before a single tile hides it.

  • Membrane on and cured in every wet area, tiler not yet on site
  • About 1 hour on site
  • Report within 24 hours
Request a quoteA few details and one of our inspectors rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage6 of 7
When to bookMembrane on and cured in every wet area, tiler not yet on site
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Fraser Rise waterproofing inspection

  • Membrane coverage across the floor and up the walls
  • Wall upturn heights at the shower and against hobs
  • Hob, threshold and step-down details
  • Bond breakers at wall and floor junctions
  • Floor waste flange bedded and sealed to the membrane
  • Falls to the floor waste and shower screed
  • Penetrations for taps, wastes and shower rails sealed
  • Membrane cure, damage and coverage before tiling
  • Primer and substrate preparation where visible
  • Set-down depth against the finished floor level
  • Junctions to baths, screens and vanities
  • Laundry, powder room and ensuite treated to the same standard
Why it matters here

Waterproofing inspections on Fraser Rise builds

A Fraser Rise double storey often has three or four wet areas, two of them above living rooms, so a small membrane fault can end up as a stained ceiling downstairs. The items we record most here are in the preparation and the detail: screeds with divots that will hold water, membrane short of the 40 mm required each side of a bath hob, screw heads in the shower base not fully covered, and membranes damaged by other trades before the tiler arrives. Each takes minutes to fix now.

What we find at this stage in Fraser Rise

  • Shower screed uneven and likely to pond
  • Bath hob junction under 40 mm of membrane
  • Screws and fixings not sealed under membrane
  • Membrane damaged by later trades
  • Membrane left exposed and unprotected
Waterproofing membrane needing protection, recorded on a waterproofing inspection in Fraser Rise
Finished membrane that needs protecting until it is tiled over
Sample findings

Sample defects found during our waterproofing inspections in Fraser Rise

Annotated findings from Waterproofing inspections.

Shower screed not smooth and continuous, recorded on a waterproofing inspection in Fraser Rise
Shower screed with divots that will hold water under the tiles
Shower waterproofing defects at screw fixings, recorded on a waterproofing inspection in Fraser Rise
Screw in a shower base not fully covered by the membrane
Bath hob junction waterproofing under 40 mm, recorded on a waterproofing inspection in Fraser Rise
Bath hob junction with less than 40 mm of membrane each side
Damaged waterproofing membrane, recorded on a waterproofing inspection in Fraser Rise
Membrane damaged at a corner and needing repair before tiling

The other stages of a Fraser Rise build

  1. Bored piers inspection in Fraser Rise1Bored piersHoles drilled and steel cages in, with the concrete pump not yet booked
  2. Slab pre-pour inspection in Fraser Rise2Slab pre-pourFormwork, pods, barrier and steel finished, a day ahead of the concrete truck
  3. Frame inspection in Fraser Rise3FrameWalls standing, trusses fixed and roof covering on, before insulation goes in
  4. Lock-up (pre-plaster) inspection in Fraser Rise4Lock-up (pre-plaster)Windows, external doors and cladding done, services roughed in, plaster not started
  5. Fixing inspection in Fraser Rise5FixingDoors, architraves, skirtings and cabinets in, painter yet to start
  6. Pre-handover (PCI) inspection in Fraser Rise7Pre-handover (PCI)House finished and cleaned, two to three weeks out from settlement

All construction stage inspections in Fraser Rise →

Guides

Construction stage guides for Fraser Rise

All guides →

Book a waterproofing inspection in Fraser Rise

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Waterproofing inspections in Fraser Rise: common questions

Which standard covers wet areas?

AS 3740 for waterproofing domestic wet areas, with the National Construction Code and Housing Provisions. Your contract and the Guide to Standards and Tolerances 2015 also apply.

Why check the screed as well as the membrane?

The screed sets the fall to the waste. Divots and rough patches hold water under the tiles, which then sits against the membrane for years.

Is a flood test part of this visit?

No. A flood test is the waterproofer's own process. We inspect by eye and by hand, which is how detail faults like bath hobs and unsealed screws are found.

Can waterproofing be inspected with the fixing stage?

Sometimes, but on a big Fraser Rise build the tiler often follows within a day or two. We would rather come early than miss the membrane.

What if some rooms are already tiled?

We inspect the rest and state which rooms were covered and not assessed.

Who pays to fix it?

The builder, who coordinates the waterproofer and tiler. The report gives them the room, the photo and the clause.