Fraser Rise Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Bored pier inspection in Fraser Rise

Piers and footing steel checked while the holes are open and every bar can still be measured.

  • Holes drilled and steel cages in, with the concrete pump not yet booked
  • About 1 hour on site
  • Report within 24 hours
Request a quoteA few details and one of our inspectors rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage1 of 7
When to bookHoles drilled and steel cages in, with the concrete pump not yet booked
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, the geotechnical report and the engineer's footing design

What is included in a Fraser Rise bored piers inspection

  • Pier positions and spacing against the footing plan
  • Pier diameter checked at the top of each hole
  • Depth against the engineer's design and the soil report
  • Founding material at the base where visible
  • Reinforcement cage size, laps and starter bars
  • Cover to the cage and centralisers
  • Hole cleanliness, spoil and loose material
  • Standing water or seepage before the pour
  • Steel projection into the slab or beam
  • Termite and service penetrations near piers
  • Set-out against the site plan and boundaries
  • Records and photographs for the engineer where required
Why it matters here

Bored piers inspections on Fraser Rise builds

Piers turn up on Fraser Rise lots where the engineer wants the footing taken down past fill or a weak layer to firmer ground. The design depends on depth, so depth is what we measure, along with the diameter and where the cage sits in the hole. Around the piers the footing steel tells its own story: on recent jobs we have photographed reinforcement sitting on the trench floor with no chairs, cover short at the edge and starter bars left without safety caps. All of it is quick to correct before the pump arrives.

What we find at this stage in Fraser Rise

  • Pier shallower than the engineering requires
  • Steel cage pushed to one side of the hole
  • Spoil or standing water in the base
  • Footing reinforcement lying on the ground
  • Starter bars without protective caps
Uncapped reinforcement bars, recorded on a pre-pour inspection in Fraser Rise
More uncapped bars along the footing line before the pour
Sample findings

Sample defects found during our bored piers inspections in Fraser Rise

Annotated findings from Bored piers inspections.

Insufficient concrete cover to footing reinforcement, recorded on a pre-pour inspection in Fraser Rise
Concrete cover short at the footing edge, leaving steel exposed to rust
Star picket and reo bar caps not installed, recorded on a pre-pour inspection in Fraser Rise
Star pickets and starter bars left without safety caps around the site
Bar chairs needed under footing reinforcement, recorded on a pre-pour inspection in Fraser Rise
Footing steel lying on the trench floor where bar chairs should lift it
Reinforcement needing cleaning before concrete, recorded on a pre-pour inspection in Fraser Rise
Reinforcement coated in mud that must be cleaned off before the pour

The other stages of a Fraser Rise build

  1. Slab pre-pour inspection in Fraser Rise2Slab pre-pourFormwork, pods, barrier and steel finished, a day ahead of the concrete truck
  2. Frame inspection in Fraser Rise3FrameWalls standing, trusses fixed and roof covering on, before insulation goes in
  3. Lock-up (pre-plaster) inspection in Fraser Rise4Lock-up (pre-plaster)Windows, external doors and cladding done, services roughed in, plaster not started
  4. Fixing inspection in Fraser Rise5FixingDoors, architraves, skirtings and cabinets in, painter yet to start
  5. Waterproofing inspection in Fraser Rise6WaterproofingMembrane on and cured in every wet area, tiler not yet on site
  6. Pre-handover (PCI) inspection in Fraser Rise7Pre-handover (PCI)House finished and cleaned, two to three weeks out from settlement

All construction stage inspections in Fraser Rise →

Guides

Construction stage guides for Fraser Rise

All guides →

Book a bored piers inspection in Fraser Rise

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Bored piers inspections in Fraser Rise: common questions

Why does pier depth matter so much?

The engineer sets the depth to reach ground that can carry the load. A pier stopped short sits in the material it was meant to pass through, and nobody can measure it once it is full of concrete.

How long are you on site for a pier check?

Under an hour on most house lots. A pier count in the dozens or a muddy site adds time.

Do you need my engineering drawings?

Yes. The pier schedule gives the depth, diameter and position for each one. Without it we can only describe what is there, not whether it is right.

A Fraser Rise pier comes up short on depth. Then what?

The report records the measured and required depths side by side. The builder and their engineer decide the fix; our job is to catch it while it can still be seen.

Are uncapped starter bars a real problem?

They are a safety hazard for everyone on site, which is why we record them. Caps cost very little and go on in minutes.

Is the pier inspection a certification?

No. Certification of a footing system belongs to the engineer and the building surveyor. We report what we observed against the drawings.

CallGet a Free Quote