New Construction Stage Inspections in Fraser Rise

Independent checks at each Fraser Rise build stage, timed for the days before the next trade covers the work.

  • Any single stage or all seven
  • Timed to the builder's program
  • Checked against your engineering
  • Report the same evening
  • Structural items flagged first
  • Previous stage list rechecked
  • Every item photographed
  • Talk it through with the inspector
Request a quoteA few details and one of our inspectors rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

The Fraser Rise build stages we inspect

A Fraser Rise build moves fast once the slab is down, and the stages that matter most are the ones where something structural is about to vanish. On jobs here we have recorded roof trusses bearing on internal walls never designed to carry them, paired LVL beams with open gaps between the members, and slab edges standing so far proud of the frame that the brick cavity is squeezed shut. Each of those is a short fix with the frame open and an engineering argument once it is lined.

Frame inspection in Fraser Rise

Frame

Walls standing, trusses fixed and roof covering on, before insulation goes in

Trusses landing only on load bearing walls, beam connections to the engineering, slab edge and plate overhang, wall plumb, studs and tie down bolts

Learn more about the frame inspection →
Fixing inspection in Fraser Rise

Fixing

Doors, architraves, skirtings and cabinets in, painter yet to start

Weep holes clear of mortar, shower niche falling inward, window rubbers and flashings seated, gaps at fascia and brickwork, earlier wet area items closed

Learn more about the fixing inspection →
Sample findings

Sample defects found during our construction stage inspections in Fraser Rise

Footing reinforcement needing bar chairs, recorded on a slab pre-pour inspection in Fraser Rise
Footing steel lying on the trench floor with no bar chairs, pre-pour
Sagging slab mesh, recorded on a slab pre-pour inspection in Fraser Rise
Slab mesh sagging between supports so cover will vary, slab stage
Ineffective shear bracket, recorded on a frame inspection in Fraser Rise
Shear bracket that cannot work because the truss bears on the wrong wall, frame stage
Cable in contact with a gas pipe, recorded on a lock-up inspection in Fraser Rise
Electrical cable touching a gas pipe with no 25 mm gap, lock-up stage
Bath hob junction waterproofing under 40 mm, recorded on a waterproofing inspection in Fraser Rise
Membrane stopping short of 40 mm each side of a bath hob, waterproofing stage
Weep holes obstructed by mortar, recorded on a fixing stage inspection in Fraser Rise
Weep holes packed with mortar so the cavity cannot drain, fixing stage
Gap to an external wall, recorded on a pre-handover inspection in Fraser Rise
Gap at an external wall junction left open to the weather, handover
Our inspectors reviewing a report together
Why Fraser Rise owners choose us

Independent. Licensed. Insured.

  • Handover is most of the work here
  • Roofs looked at from above
  • Wet areas checked with instruments
  • A list a supervisor can close
Guides

New Construction Stage Inspections guides for Fraser Rise

All guides →

Book new construction stage inspections in Fraser Rise

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

New Construction Stage Inspections in Fraser Rise: common questions

Which stages should a Fraser Rise owner prioritise?

Frame first, then slab, then the handover. Frame is where we keep finding load paths that do not match the engineering, and it is lined within days.

Can I add stages after the build has started?

Yes. Book whichever stages are still ahead of you. We note in the first report that earlier work was already covered and could not be assessed.

Does the builder need to agree to an independent inspector?

You own the land and the home being built, and no standard Victorian domestic building contract shuts out your own consultant. We arrange access with the supervisor and keep out of the trades' way.

What sits outside a stage inspection?

We do not test or energise services, take soil or concrete samples, or certify footings and framing. Where a fix needs design, the report says an engineer should sign it off.